английский язык

Помогите пожалуйста очень надо. 21.

Оставить ответ
1

Ответ №1

Our ship has just arrived at the port of Tallinn. We took the general (general)
cargo in the holds and on deck vehicles. Our ship was late by 20 hours due to a severe storm in
The Baltic Sea. Because of the pitch and roll of the cargo and the ship was moved (to
have) list to port. The bank was due to the fact that the goods have been loose in the port
waste. Ahoy Captain announced. All members of the crew went into the hold and secure the load. all
was done up (to put in order) before the arrival at the destination port.

Знаете ответ?